Plans stage monitor11/13/2022 ![]() The principal contractor should be appointed by the client early enough in the pre-construction phase to allow them to work closely with the client, and in any event before the construction phase begins. A contractor must plan, manage and monitor all work carried out by themselves and their workers.Įarly appointment of the principal contractor.A principal contractor must plan, manage, monitor and coordinate health and safety during the construction phase of a project involving, or likely to involve, more than one contractor. ![]() A principal designer must plan, manage, monitor and coordinate health and safety during the pre-construction phase (design and planning stage) of a project involving, or likely to involve, more than one contractor.The client must make suitable arrangements for managing their project, enabling those carrying it out to manage health and safety risks in a proportionate way.Planning for construction work Who is responsible? Falls and trips in construction 2007-2010.Controlling physical ill health risks - Key points.Controlling physical ill health risks overview.Controlling hazardous substances - Key points.Controlling hazardous substances overview. ![]()
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |